Carrington Hall Office Infill

  • Sale Price: $202,00.00
  • Start Date: May 2013
  • Final Completion: August 2013

Scope of Work

MSI was hired to remodel eleven offices at Carrington Hall at Missouri State University. The hall is the oldest buildings on the University being constructed in 1908. The building serves as home for many of the administrative offices and contains an auditorium that is used for classes, concerts, films, lectures, and other special events. MSI’s job was to completely demo offices to the bones and bring them back to life with the modern amenities, look and feel of today’s standards. From framing, to lighting, to the last coat of paint; we completed this project to the satisfaction of the client and on time.

Demolition:

  • Remove existing plaster walls
  • Doors and hardware
  • Ceiling grid and ceiling tile
  • Lighting fixtures
  • Mechanical equipment
  • Remove VCT floor covering and prepare area for finishes

Installation:

  • Metal stud framing
  • Sheetrock
  • Doors and hardware
  • Finishes, painting
  • Ceiling grid and tile
  • Lighting fixtures