Yates Hall Project

Demolition:

  • Removed drop ceiling on all four floors to access main duct supply.
  • Removed all HVAC equipment and associated piping, electrical, ductwork back to mechanical room where steam & chilled water entered the building from main campus loop.
  • Removed (4) Air Handler Units, (1) Heat exchanger & associated components..
  • Removed commercial water heater.

Installation:

  • Installed 2 Air Handlers Units capable of providing enough air conditioning for 4 floors in Yates Hall.
  • The first Air Handler Unit was shipped in four pieces. It was our responsibility to get maneuver the equipment down two flights of stairs to the basement mechanical room.
  • The second Air Handler Unit was also shipped in four pieces. This equipment was lifted by a crane in 4 pieces pulled through a window that we took out in order to get the equipment inside.
  • Installed (43) Vav’s to each classroom, office and laboratory. All associated ductwork, piping and electrical make-up.
  • Installed a new Honeywell BAS system.